欧美一卡二卡成人免费,亚洲一本二本在线视频,国产免费AV一区二区三区四区,东京无码在线

Contact Us

Cross Flow Fan Installation and maintenance requirements

Date: 2016-5-13   Click: 1634 Times

1, "Cross Flow Fan" ambient temperature should be 75ºC ≥ -40ºC.
2, industrial gas through the cooling fan does not allow strong acid, alkali and various solutions.
3, does not allow dust and other debris fall into the fan, so as to avoid burning and fan blades break.
4, "Cross Flow Fan" before installation should first check whether the damage caused due to packing and shipping, deformation, if damaged or deformed should be repaired after installation.
5, and then check the "Cross Flow Fan" all parts and screws are loose; whether touching or displacement between the blade and duct before installation if the touching or the shift should be adjusted. To replace the fan products from different manufacturers, you need to measure fan site size holes.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 仪陇县| 临汾市| 裕民县| 新密市| 濮阳县| 聂荣县| 十堰市| 漳州市| 台东市| 安塞县| 南丰县| 玉门市| 报价| 常州市| 灌阳县| 双柏县| 南涧| 外汇| 乌苏市| 绥中县| 抚州市| 中西区| 宜春市| 阿克苏市| 永胜县| 申扎县| 松滋市| 绥滨县| 定日县| 六安市| 那曲县| 滦南县| 胶南市| 宁都县| 嘉兴市| 宜春市| 五河县| 蛟河市| 淅川县| 江油市| 车致|